> ## Documentation Index
> Fetch the complete documentation index at: https://help.yournewdoor.com/llms.txt
> Use this file to discover all available pages before exploring further.

# Switch a proposal between repair and replacement

> Fix a proposal's work type before the customer accepts it, without rebuilding it.

When a proposal was built as the wrong type, switch it between **Repair** and **Replacement** from Workbench before the customer accepts it. Dispatchers, Admins, Managers, PMs, Executives and the Owner can do this. CSRs, Design Concierges, Door Experts and Installers can't.

**1. Open the proposal in Workbench**

Open the proposal from the customer page or **Open Workbench** on the estimate. The header shows its type, **Replacement** or **Repair**, with what that means underneath: **Needs site assessment** or **Repair deposit — no site assessment hold**.

**2. Find the Work type card**

The **Work type** card sits in the main column, above **Versions**. It shows when the proposal is a draft or has been sent, and your role can switch it.

**3. Pick the other type**

Click **Replacement** (**"Needs a site assessment after the \$99 reservation fee"**) or **Repair** (**"Repair deposit path — no site assessment hold"**). Clicking the type it already has does nothing.

**4. Confirm**

The card asks **"Convert this proposal to Repair?"** or **"Convert this proposal to Replacement?"**. Click **Confirm convert**, or **Cancel** to keep it as it is. The page refreshes with the new type.

## What switching changes

* **The type the customer sees.** The proposal shows as a repair or a replacement proposal on the customer's page.
* **A new version, once it's been sent.** Switching a sent proposal saves a new version, so the version the customer was sent stays on record. The customer link opens the new version.
* **Payment cards, only if you left them alone.** When the payment cards are still at the starting setup for the old type, they switch to the starting setup for the new type. Repair proposals start with **Pay in full** turned off. If you changed which cards show, your choice stays. See [Which payment cards show](https://help.yournewdoor.com/proposals/what-the-customer-sees.md#which-payment-cards-show).

Switching doesn't change the proposal's openings or lines, any invoice, payment or booked visit, or the job. If the job already exists with the wrong type, change it on the job page. See [Change a job's type](https://help.yournewdoor.com/jobs/job-type.md).

## When you can't switch

Only a draft or sent proposal can switch. Once the customer has opened it, asked for changes, accepted or declined, or it has expired or been voided, the **Work type** card doesn't show. To fix the type after the customer accepts, change the job's type instead.

| Message | What it means |
| - | - |
| **"This proposal's status doesn't allow a type convert (draft or sent only)."** | The proposal moved past sent. Refresh the page. |
| **"This proposal changed while converting — refresh and try again."** | Someone changed the proposal at the same moment, for example the customer accepted it. Refresh and check before trying again. |
| **"You don't have access to convert this proposal's type."** | Your role can't switch a proposal's type. |
| **"Choose Repair or Replacement."** | Pick one of the two types. |
| **"Proposal not found."** | The proposal couldn't be found. Refresh the page. |

## Next

> [card] [Change a job's type](https://help.yournewdoor.com/jobs/job-type.md)
>
> Switch a job between repair and replacement after the customer signs.

> [card] [Proposals: all tasks](https://help.yournewdoor.com/guides/proposals.md)
>
> Every task for this area.


This documentation is built and hosted on [Mintlify](https://mintlify.com), a developer documentation platform.