The four gates
Open a job to see its gates. Each gate shows Ready or Blocked, with a short list of items to confirm.
A gate turns Ready when every item on it is confirmed. The map pin warning never counts. While any item is open, the gate shows how many are left and that the job can’t be scheduled yet.
Work a blocked job
1
Open the job
From Jobs, open the job and look at its gates. Each blocked gate lists what’s still open.
2
Fix the real problem
Order the material, confirm site access with the customer, or line up the right installer. If you can’t fix it, flag the job. See Exceptions and red flags.
3
Mark it confirmed
Click Mark confirmed next to the item. If you confirmed something by mistake, click Reopen. Everyone except installers can do this.
4
Schedule it
When all four gates are Ready, the job is ready for the dispatch map.
No map pin yet
A job whose property has no map coordinates shows this warning on the Site gate: “No map pin yet. Scheduling is not blocked; the pin fills in from the address.”- It never blocks the gate or the schedule, and it isn’t counted in the gate’s open items.
- It has no Mark confirmed button. There’s nothing to confirm.
- It goes away once the property has a pin. Field Ops finds the pin from the address when you open the job, and a property that already has a saved pin doesn’t get the warning.
Pick the installer
The scheduling form on the job page and on Dispatch has a Lead installer list. The lead is the person in charge of the job.- It lists active installers only. Removed users and QA or test accounts are left out.
- Installers in the job’s market come first, then everyone else, each in name order. When Field Ops suggests the closest installer, that name ends in nearest.
- You can open the list and look through it while the job is still blocked. Schedule with date (or Schedule consecutive days on a multi-day job) stays off until every gate is Ready.
Set the start and end time
On a job that isn’t scheduled yet, the scheduling form fills in Start and End for you, starting the next day. Change them to any time you need.- Start and End show in your profile timezone. The default is always 9:00 AM Central, so someone in Pacific time sees an install start at 7:00 AM.
- The time you pick is the time that’s saved, and it shows the same on the schedule, the job and the field packet.
- On a multi-day job, every day starts at the same Central time, even across a daylight saving change.
- A job that’s already scheduled opens with its booked times, not the defaults. Saving doesn’t move them unless you change them.
Pick an arrival window
Install jobs have an Arrival window row above Start and End with seven 2-hour quick picks: 9-11 AM, 10 AM-12 PM, 11 AM-1 PM, 12-2 PM, 1-3 PM, 2-4 PM and 3-5 PM, all in Central time. A new install starts on 9-11 AM.1
Click a window
It fills in Start and End and the window is highlighted. The line under the picks reads “2-hour window · Quick picks fill Start / End · times stay editable”.
2
Adjust if you need to
You can still type any Start and End. A window stays highlighted only while the times match it exactly.
- A pick keeps the day already in the form. On a multi-day job, the start is on the first day and the end is on the last day.
- The picks show on install jobs only. Repair and warranty jobs use Start and End with the defaults in the table above.
- A job booked at another time, for example 9:00 AM to 4:00 PM, opens with its saved times and no window picked. Nothing moves to a window unless you click one.
- Site assessments use the same seven windows. See Book a site assessment.
Add more installers
When a job needs more than one person, put a crew on it: one lead installer plus helpers on the same appointment.1
Pick the lead
Pick the person in charge in Lead installer. Field Ops checks the lead’s skills and certifications against the job.
2
Tap the helpers
Under More installers, tap each extra person’s name. A picked name is highlighted. Tap it again to take them off. The line under the names reads “Same truck and time as the lead. Pay stays with the lead.”
3
Schedule the job
Set Start and End and click Schedule with date (or Schedule consecutive days). Everyone on the crew goes on the same appointment.
- One truck, one slot. The crew shares the lead’s appointment, so helpers don’t use up extra room in the day.
- No double-booking. Each person is checked against their other appointments, whether they’re the lead or a helper there. A busy person is refused by name, for example “(name) already has two appointments on (day) (anchor + second stop).” For a multi-day job it reads “(name) already has work on (day). A multi-day job needs the whole day on consecutive days.”
- Field staff only. Helpers have to be active field installers. Office staff are refused with “(name) is office staff. Add field installers only.” Only the lead’s certifications are checked.
- Installers only on installs. On an install job, the lead and every helper must be installers. Field Ops refuses anyone else with “Assign an installer.” for the lead or “(name) is not an installer.” for a helper. Repair and warranty visits keep the field staff rule above.
- No limit. Add as many helpers as the job needs.
- Pay stays with the lead. Adding helpers doesn’t change who the job’s pay goes to.
Change the crew
Once a job is scheduled, its scheduling form opens with the current lead, helpers, start and end already filled in.- A new Start or End always wins. If you change the time while you change the people, the visit is rebooked at the time you entered, and the Schedule shows that time as soon as you save. Only a save with the exact same start and end keeps the visit in place.
- The job’s history shows the crew before and after each change.
- You can’t change the crew on a job that’s on hold (“This job is on hold. Resume it before continuing.”) or finished (“This job is finished. The crew can’t change.”).
- Helpers you add in Field Ops stay on the job when ServiceTitan updates it.
Open the crew from Schedule
On the team Schedule, the hover card or popover of an install, service or warranty visit has an Edit crew link. It opens the job’s Schedule tab with the Assign box highlighted and marked Edit crew. Change the lead and helpers there and save as described above. Only roles that can edit the schedule see the link: dispatchers, managers, executives, admins and the Owner.Remove a helper from Dispatch
On the Dispatch board, each helper has their own copy of the stop on their truck. That copy has Remove helper instead of Pull off truck.- Remove helper takes only that person off the crew. The lead, the visit and the other helpers stay.
- To take the lead off, use Pull off truck on the lead’s stop. That unassigns the job.
- Neither button shows once the job is in progress or done.
Crew from ServiceTitan
On the job’s Schedule tab, anyone ServiceTitan put on the crew has a small note next to their name: From ServiceTitan, remove there too. It shows next to the Lead installer list when the lead came from ServiceTitan, and next to each helper’s name under More installers. If you take one of these people off in Field Ops, they come back the next time ServiceTitan updates the job. To take them off for good, remove them from the appointment in ServiceTitan as well.Where the crew shows
- Job page: the Appointments list names the whole crew, lead first, for example Jordan (lead), Sam.
- Schedule: the card shows the lead’s name followed by +1, +2 and so on for the helpers, in every view including Month and List. The hover card and the read-only popover list the whole crew, lead first, for example Jordan (lead), Sam. See Schedule.
- Dispatch: the stop shows on the lead’s truck and on each helper’s truck, where it’s tagged Helper · lead (name). The map still shows one pin per visit. See Helpers on the board.
- Helpers’ phones: each helper sees the job on Field home and My schedule and can work its field packet. See Field packet.
Common blockers
Scope is blocked
Scope is blocked
Some openings aren’t measured or some lines don’t say which door or options were sold. Field Ops doesn’t fill these in for you. Ask the Door Expert or the office to complete the sale details.
ServiceTitan details are missing
ServiceTitan details are missing
If the original sale is missing some ServiceTitan details, the job’s Sold scope tab lists them. They don’t stop the job. Sales Ops still posts the sale to ServiceTitan.
The job won't go on the schedule
The job won't go on the schedule
That’s expected until every gate is Ready. Field Ops shows which gates are still open, for example Not ready to schedule. Open gates: Material, Site.
Next
Dispatch map
Put ready jobs on a crew and a day.
Jobs desk
Find a job and open its gates.
